06 · OUTPUT

First laminated timber chassis off the press

Seven layers, glued under hydraulic pressure, cured in 14 hours. The chassis came out a kilo under spec.

FIG. FIRST-LAMINATED-TIMBER-POUR  ·  TILE COMPOSITION

We pressed the first proprietary laminated timber chassis at the partner facility this fortnight. Seven layers, hydraulic press, fourteen hours under cure. The first piece came out a kilo lighter than the spec and was inside dimensional tolerance on every node.

There is a long road between a successful press and a manufacturable chassis. The press is the headline; the manufacturable spec is the work. Iterations on the lay-up sequence and the curing schedule are already underway.

Back to Output